Kirk Sandall, Doncaster

Client
Oyster Capital Industrial Ltd
Location
Kirk Sandall, Doncaster
Planning Authority
Doncaster Metropolitan Borough Council
Services
Transport Assessment, Framework Travel Plan

Project Overview

AMA were commissioned by Oyster Capital Industrial Ltd to prepare a Transport Assessment and Framework Travel Plan to accompany an outline planning application for 125,000ft2 of industrial development, proposing a mixture of B1(c) / B2 / B8 industrial / logistics units in Kirk Sandal, Doncaster.

AMA staff had previously advised client KeyLand Developments on this site to gain a planning consent for a similar development proposal which had lapsed. Therefore, the site was acquired for a resubmission and updating of all technical appraisals for the fresh Oyster Capital Industrial application.

Key Inputs / Outcomes

  • AMA prepared and agreed an updated scope with Doncaster Highways given the significant development that had been consented or taken place in the vicinity of the site since the previous permission was obtained.
  • AMA obtained updated traffic counts for the key junctions on the local network and undertook appropriate capacity assessments of these, again justifying that there was a negligible impact on the junctions and that no off-site mitigation would be required.
  • AMA also prepared a robust Framework Travel Plan to support the proposals given its limited proximity to sustainable modes of transport. DMBC accepted these principles and provided a recommendation for approval based on AMAs professional reports / technical assessments.
Share this project
View More Projects
The quality of our team is what makes us exceptional

Talk to our specialist team of transport planning and infrastructure engineering experts

Let's Discuss Your Project
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram