Land North of Wellend Bank, Boston (Hospital)
Services
Flood Risk Assessment and Drainage Strategy
Project Overview
With the vulnerable nature of the hospital development at Wellend Bank, and flood depths of 1.80m, AMA's expertise in appropriate mitigation measures was applied with consideration for the difficulties of evacuating vulnerable people. A detailed Flood Evacuation and Emergency Plan was also provided for this development that considered the needs of different patients as well as measures to be taken to enable on-site refuge in the event of a flood.
Key Inputs / Outcomes