Land North of Wellend Bank, Boston (Hospital)

Client
Class Q
Location
Boston
Planning Authority
Boston Borough Council
Services
Flood Risk Assessment and Drainage Strategy

Project Overview

With the vulnerable nature of the hospital development at Wellend Bank, and flood depths of 1.80m, AMA's expertise in appropriate mitigation measures was applied with consideration for the difficulties of evacuating vulnerable people. A detailed Flood Evacuation and Emergency Plan was also provided for this development that considered the needs of different patients as well as measures to be taken to enable on-site refuge in the event of a flood.

Key Inputs / Outcomes


Share this project
View More Projects
The quality of our team is what makes us exceptional

Talk to our specialist team of transport planning and infrastructure engineering experts

Let's Discuss Your Project
crosschevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram